One team,
brief to release
Planning, screen design, engineering, store submission and post-launch operation are handled by the same people. Nothing is handed over, so no decision loses its reason.
The name gongbang — workshop — describes the method, not the mood.
Planning, screen design, engineering, store submission and post-launch operation are handled by the same people. Nothing is handed over, so no decision loses its reason.
Every feature ships with automated tests. The whole suite runs before each release, so behaviour that used to be correct does not quietly break.
Small screens, enlarged system fonts, no network at all. We verify those before submitting. Working only on a developer's machine does not count as finished.
How we build
A workshop is not a production line. We cap the number of projects open at once and finish one before starting the next.
That means we decide to remove features more often than we decide to add them. Every element on a screen, the size of a button, the length of a sentence — each is chosen deliberately rather than assembled from parts.
Platforms
Google Play and the App Store differ in review criteria, privacy disclosure and advertising policy. Satisfying one does not satisfy the other, so we track both separately.
app-ads.txt publisher verification